Case study · Infrastructure

Roe Development – Road Verge & Amenity Areas

Home

/

Case Studies

/

Roe Development – Road Verge & Amenity Areas

Operative hydroseeding a road verge embankment Infrastructure

Roe Development – Road Verge & Amenity Areas

Road verge grass and native wildflower meadow hydroseeded across 1,300m² in a single day, meeting biodiversity net gain requirements.

The challenge

Roe Development required rapid establishment of 1,300m² of roadside verges and amenity grassland across their new development site. The project needed a dual approach combining hardwearing road verge grass for high-visibility areas with native wildflower meadow for ecological enhancement zones. Traditional seeding methods would have risked erosion during establishment, and the developer required a cost-effective solution that could meet planning conditions for biodiversity net gain while delivering rapid stabilisation ahead of site handover.

Our solution

As Profile Products Certified specialists, we deployed our hydroseeding service using two complementary seed mixes tailored to specific site zones. We applied A18 road verge seed to high-traffic visibility areas, providing durable, low-maintenance grass cover. For amenity zones, we used EM2 Standard General Purpose Meadow mixture, containing native wildflower and grass species suited to a wide range of soil conditions. Our hydraulic mulch seeding process ensured immediate erosion control and optimal germination across the entire 1,300m² site.

Results

On-Time Delivery

Completed hydroseeding across all zones in 1 day, with visible germination within 7 days and full establishment in 5 weeks.

Cost Savings

Achieved 35% cost reduction compared to turf installation while delivering enhanced biodiversity value and lower long-term maintenance requirements.

Quality Results

99% erosion control achieved immediately with successful establishment of native meadow species meeting biodiversity net gain requirements.

“Green Care Solutions provided exactly what we needed for our road verges and amenity areas. The combination of A18 and EM2 seed mixes delivered both practical functionality and ecological value. The hydroseeding was completed efficiently, and the results have been excellent. We’ll definitely use them again on future developments.”

Project Director, Roe Development

Project details

Client

Roe Development

Location

East Midlands

Sector

Infrastructure

Scale

1,300m² verges and amenity areas

Completed

May 2025

Services delivered

Hydroseeding

Biodiversity Net Gain

Erosion Control

Discuss a Similar Project
More Projects

Related Case Studies

View All Case Studies
Free site assessments · Technical advice · Competitive quotations

Ready to Discuss Your Project?

Whether you need hydroseeding for a large infrastructure project, complete landscaping for a new development, or reliable grounds maintenance for your public estate, our team is ready to help.

Free site assessments

Technical advice and specifications

Competitive commercial quotations

Project planning and scheduling

Send us a Message

Get in touch with our commercial landscaping team

Thank you. We have received your details and will be in touch shortly.